Image Description
Image Description
Image Description
Image Description

Goulburn

The Goulburn Mulwaree Council opened a new Waste Water Treatment Plant in October 2018, which included a new treatment plant, pump station, and rising main in order to provide the necessary infrastructure for the city into the future. The new treatment plant will meet modern environmental standards and will also provide recycled water for the Goulburn Reuse Scheme which will be used to maintain Goulburn’s green spaces.

The T2 Energy scope of work on this project included the supply of:

  • 1 x 1,250kVA Cummins C1250D2RCC Diesel Generator
  • 1 x 2,500A IP54 Motor Control Centre, including HDG support frame to suit the switchroom flooring
  • 1 x IP56 Stainless Steel Metering Panel
  • 4 x IP56 Powder Coated Stainless Steel MOS Tank I/O Panels, including pneumatic controls
  • 3 x IP56 Powder Coated Stainless Steel Truck Fill Panels, including HDG common free standing support frames
  • 52 x Local Operator Panels, including HDG free standing support frames

< Back to mining and industrial solutions