Image Description
Image Description
Image Description

North Pine Dam

As part of SEQ Water’s upgrade project at North Pine Dam T2 Energy was responsible for the design and manufacture of two new Motor Control Centres, as follows:

MCC 001:

630A, 415V Main Switchboard, inclusive of:

  • Generator/Main Supply Changeover Switch
  • 415VAC Power Distribution
  • Auto dialer interface

MCC 002:

250A, 415VAC Gate Control Switchboard, inclusive of:

  • All Gate controls
  • Sump Pump controls
  • Hydraulic Pump controls

< Back to mining and industrial solutions